DRILLNOVA,Roller-bit drilling interval log Make a setting change interpretable without mixing cutting time with interruptions. Date / shift, Rig model and crowd system, Kelly configuration, Barrel identifier / diameter / layout, Formation and rock-entry depth, Pressure-display channel / units, "OEM conversion or measurement reference, if available", Site-agreed operating envelope, Interval start / end time,Clock source,Start / end depth (m),Actual cutting time (min),Rotary-head RPM (steady value or range),Crowd reading + units,Changed variable,Vibration / resistance,Lift / clear / recover time (min),Tool inspection / action ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, ,,,,,,,,, Fluid and bore-condition observations, Before/after tool-photo references, Accepted baseline for the next interval, Reason for pause or stop, Reviewed by, Engine RPM and rotary-head RPM require separate labels. Do not convert hydraulic pressure to WOB without the applicable rig information. Calculate ROP only from a defined interval; advance per revolution = ROP / (60 × RPM) only for consistent cutting and speed data. "No WOB, RPM, lift distance or fixed inspection interval is prefilled."